W/C ratio in concrete

As per IS 456 table 5 for RCC - M 20 : 0.55, M 25 : 0.50, M 30 : 0.45, M 35 : 0.45, M 40 : 0.40

C2S present in cement requires 21 % of water and C3S requires 24% water for complete reaction in concrete. The C-S-H gel requires 15% water to fill all voids inside concrete. Hence average of (21+24 /2 = 23%) + 15% = 38% water is at least required in concrete. However it may be lowered by using admixtures.

Comments

Popular posts from this blog

Why do we test concrete on 28th day? why not on 27th day or 29th day?

Cement IS 269